HPOD SELF-CONSUMPTION PRESENTATION BREAKFAST MEETING

On 29 June you can attend a presentation of the Self-consumption solution with storage in an HPOD.

This turnkey plug-and-play solution is suitable for all types of sites (isolated, mains connected, domestic and industrial) and is able to handle all available energy sources.

It incorporates the Optimee’z monitoring system by Monabee that also handles electrical devices.

Save the date!

Thursday 29 June 2017
From 08:30
in Biot

A 200 kVA genset has been installed in an 8-apartment building in Saint-Martin!

The generating set is used as back-up for the grid to ensure maximum comfort for the building’s inhabitants. The unreliable mains supply in Saint-Martin does not guarantee access to electricity during the whole day.

200 kVA GENERATING SET

ESP power: 198 kVA
PRP power: 180 kVA
Rated speed: 1500 rpm
Fuel tank capacity: 285 litres
Number of cylinders: 6
Optional automatic start-up
Available in 3-phase, 260/1A

For more info click here.

Groupe électrogène 200 kVA GENERATING SET
Groupe électrogène 200 kVA immeuble

Our HPOD were presented at YESSS in Pertuis on 9 June this year!

HPOD, A WIDE RANGE FOR DIVERSE REQUIREMENTS

The HPOD was originally created to enable companies and the general public in isolated locations to access electricity by mixing solar and thermal energy. The product has since evolved in line with our customers’ requirements. It was therefore subsequently used to provide back-up for unreliable mains supply.

Following numerous requests from tradespeople and community groups, we created the HPOD Mini, which is mobile, smaller and can be recharged just as easily via the mains or a vehicle alternator. This led to the Micro, built-in or integrated, and now the HPOD Autoconso.

Hybrid Energy has always been customer focussed and has always been able to offer a product range perfectly adapted to requirements.

To view the entire range click here.

HPOD chez yesss 4
HPOD chez yesss 3

Our generating sets were presented at the company KDI DAVUM on Reunion Island during their open days held on 8 and 9 June this year.

For the 20th staging of their open days, KDI DAVUM decided to bring together all its equipment suppliers at its branch office in Le Port.

They cut up a car and subsequently reassembled it, with the help of various suppliers present who specialise in cutting, welding, etc.

GELEC GENERATOR SETS

Designed to meet the needs of tradespeople, shopkeepers, farmers, industry and the general public who wish to safeguard or power their installation at the best value for money.

From 9 to 2000 kVA, our gensets are “industrially” powered at 1,500 revs and 12V or 24V, with a treated steel enclosure and stainless steel fastenings and locks to ensure maximum longevity.

To find out more about our generating sets click here.

Première électrification de sirènes d’alarme de barrage pour EDF avec un HPOD solaire à Tarascon Sur Ariège !

Comment fonctionne le HPOD solaire ?

Grâce au système HPOD, l’électrification du système d’alarme du barrage est totalement autonome. L’énergie solaire charge le HPOD qui électrifie ces alarmes. Tout est automatisé.

L’installation de ce type de système est très simple, tout est Plug&Play. Il suffit de branchez les sources d’alimentation (panneaux photovoltaïques, réseau, éolienne, hydrolienne, vous pouvez même le recharger avec l’alternateur de votre véhicule) au HPOD, de brancher ce qu’il doit alimenter et tout fonctionne tout de suite.

Le HPOD installé sur ce système est un HPOD Mini. Tout le système, intelligence et stockage est configuré dans un caisson de type “flycase” de 50x50x50cm. Grâce à ses 4 roulettes et ses poignées latérales il est facilement transportable. Différentes puissances et différentes capacités de stockage sont disponibles en fonction de l’utilisation finale. Les batteries, AGM ou Lithium, ne nécessitent aucun entretien. Notre bureau d’études nous permet de faire une analyse personnalisée de vos besoins et ainsi de définir la machine la plus adaptée.

Vous pouvez découvrir une partie des installations HPOD en fonctionnement en France et dans le monde entier ici.

Plus d’infos sur ces barrages hydrauliques :

En 2015, EDF Hydraulique AUDE-ARIEGE a décidé de moderniser ses installations. Suite à ça, le chantier d’envergure d’Aston a débuté. Le plus important pour EDF, la fiabilité, un haut niveau de sûreté et respect de l’environnement. EDF a voulu aller plus loin et ne pas être un simple producteur d’électricité, il contribue également à la gestion équilibrée et concertée des différents usages de l’eau. C’est ainsi qu’en 2015, il ont lâché plus de 12 millions de m3 d’eau pour le soutien d’étiage de l’Ariège et de la Garonne.

HPOD solaire pour edf tarascon-sur-ariege
HPOD solaire pour edf tarascon-sur-ariege face