Continuity of operations is crucial for a supermarket. That’s why U Express in Montredon (11) has enhanced its ability to provide a flawless shopping experience by installing a Gelec Energy generator set.

This preventative measure ensures that, in the event of a power outage, critical elements such as refrigerators, lighting, and cash registers remain operational through an integrated source transfer switch. The initiative aims not only to ensure customer safety but also to preserve the quality of products. The Gelec Energy generator set serves as a reliable safeguard against these disruptions, allowing the supermarket to maintain its operations and serve its clientele without interruption.

We have installed a TIGER-220YC generator with a capacity of 220 kVA in the long-range version from GELEC Energy. This generator features the safety option NFE 37-312.

  • Power: 220 kVA
  • Location: France

Continuity of operations is crucial for an event on the scale of the Olympic & Paralympic Games. That’s why GELEC Energy has committed to ensuring an uninterrupted power supply for Paris 2024, by installing four emergency generators at the largest temporary military camp.

This preventive measure ensures that, in the event of a power cut, the camp’s vital infrastructure – such as communication systems, lighting and safety equipment – remains operational via an integrated source inverter system. The initiative aims not only to guarantee the safety of athletes and staff, but also to maintain the camp’s logistical and operational efficiency.

We installed three 250 kVA TIGER-250YC gensets and a 440 kVA LION-440 from GELEC Energy. These generators benefit from the NFE 37-312 safety option.

  • Location: France
  • Event: Paris 2024 Olympic & Paralympic Games
  • Installation : ADV SERVICES (2AST group) who inspected the installations and carried out the mains cut-off tests on the camp.

Groupes électrogène GELEC Energy 250 kVA JO Paris 2024Groupes électrogène GELEC Energy 250 kVA JO Paris 2024